Maritime / Ports & terminals
Berth allocation and terminal throughput
Reduce vessel waiting and equipment contention across a terminal.

01 / The commercial question
How can berth allocation reduce port congestion?
A faster berth decision can move congestion into the yard. Model the handoff between berth, cranes and storage so that a candidate cannot improve vessel turnaround by creating an unmeasured downstream queue.
02 / Experiment design
How Discovery would approach berth allocation and terminal throughput.
- 01 / Starting program
What does the first ports & terminals experiment start from?
- First-come-first-served berth allocation with fixed crane assignments.
- 02 / Objective & constraints
What counts as a better answer?
- Total vessel waiting time and container throughput, constrained by berth length and crane availability.
- 03 / Data & evaluation
How is each candidate tested?
- Arrival traces, handling times and equipment shifts in a terminal queue simulator.
- 04 / Validation path
What has to hold before it reaches operations?
- Compare on peak-arrival days and equipment outages, not only average traffic.
- 01 / Source systemBerths, cranes + yard records
- 02 / Input dataArrival and handling traces
- 03 / Candidate programBerth and crane allocator
- 04 / EvaluatorTerminal queue simulator
- 05 / Recorded outputWaiting time + yard backlog
03 / First experiment
Make the comparison reproducible.
Freeze the seed program and the grader. Compare candidates under equal evaluation budgets, keep every failed run, and reserve unseen scenarios for the final test.
What you receive: the accepted program, its score against today's rule on held-out scenarios, and the record of directions tried. The full method.
04 / Related
Related operating decisions.
Maritime / Fleet & charter planningVessel scheduling and charter allocationAssign vessels to contracts while accounting for repositioning, availability and delivery windows.Scheduling · Simulation
Energy / Renewable operationsRenewable asset maintenance schedulingPlan inspection and maintenance windows without sacrificing high-value generation.Scheduling · Allocation
Manufacturing / Production linesJob-shop scheduling and production sequencingSequence work across machines with setup costs and delivery deadlines.Scheduling · Queues